UNDERGROUND AND ABOVEGROUND CABLE PULLING WORKS
UNDERGROUND & ABOVEGROUND CABLE PULLING WORKS [3GP ME&I INSTALLATION PROJECT]
FUTURE GROWTH PROJECT (FGP) / WELLHEAD PRESSURE MANAGEMENT PROJECT (WPMP)
CLIENT / END-USER
SENIMDI KURYLYS / TENGIZCHEVROIL
LOCATION
TENGIZ, KAZAKHSTAN
SCOPE OF WORK
UNDERGROUND CABLE PULLING WORKS
(~ 270 km in trenches):
(~ 400 km through pipe racks and modules):
05.2021 – 01.2023
FUTURE GROWTH PROJECT (FGP) / WELLHEAD PRESSURE MANAGEMENT PROJECT (WPMP)
CLIENT / END-USER
SENIMDI KURYLYS / TENGIZCHEVROIL
LOCATION
TENGIZ, KAZAKHSTAN
SCOPE OF WORK
UNDERGROUND CABLE PULLING WORKS
(~ 270 km in trenches):
- Cable Pulling, Cutting, Dressing, Tagging, Sand Backfilling with 1bt (sand), Installation of protective tiles and warning tape, Glanding, Splicing and Termination, Testing
(~ 400 km through pipe racks and modules):
- Cable Pulling , Cutting, Dressing, Cleating, Tagging, Glanding, Splicing and Termination, Testing
05.2021 – 01.2023