SUPPLY, INSTALLATION, AND COMMISSIONING OF CISCO ACTIVE EQUIPMENT FOR THE GAZLI-SHYMKENT AND BGR-TBA GAS PIPELINE PROJECT
A COMPLEX OF WORKS FOR THE SUPPLY, INSTALLATION, AND COMMISSIONING OF CISCO ACTIVE EQUIPMENT WITHIN THE FRAMEWORK OF THE PROJECT "CONSTRUCTION OF A GAS MEASURING STATION AND A CAMP AT THE GAZLI-SHYMKENT AND BGR-TBA GAS PIPELINE"
CLIENT / END-USER
VVK/ INTERGAS CENTRAL ASIA
LOCATION
SHYMKENT, KAZAKHSTAN
SCOPE OF WORK
11.2020 – 05.2021
CLIENT / END-USER
VVK/ INTERGAS CENTRAL ASIA
LOCATION
SHYMKENT, KAZAKHSTAN
SCOPE OF WORK
- Length of the route MG GAZLI-SHYMKENT: 125 km
- Length of the route MG BGR-TBA: 3 km
- A complex of works for the supply, installation and commissioning of CISCO active equipment.
11.2020 – 05.2021